Dear
Comrdes,
I
contacted the Officials of DOPT who were instrumental on examination of the last CR proposal of CBEC. They are having the opinion that the temporary AC posts have been created to
fill up by promotees only hence Gr-A RRs are to be based on the approval of CR
by Cabinet. As it was approved by the cabinet that the temporary posts are
for five years and no temporary AC will
get further promotion and these are to be filled up by way of promotions only ,
the RRs are to be based on such provision. It is not opened either to CBEC or to DOPT to deviate
such provisions approved by Cabinet. However they are having the opinion that the incumbent of such
Temporary AC would not be reverted after
2018 till he gets further promotion or retires
from service and like the regular posts there can be a provision that
continuance of such Temporary posts should be based on a further study
considering the work load and level stagnation
in feeder cadres etc. They are having
the opinion also that the representation against the draft RRs
should be based on such two points. They
cautioned that if temporary posts will
be merged with regular posts and there should be a provision to allow further
promotions to temporary ACs , then 50% of such posts are to be allotted to
direct recruitees.
As
regards increase of promotee quota, promotion to STS, allowing weightatge, post
based roaster, and to maintain parity starting
from sub-feeder grades etc cabinet
approval is required basing on a recommending proposal of parent department
routed through D/O Expenditure, DOPT , Cabinet subcommittee headed by Cabinet
Secretary, FM, Minister of DOPT etc.
Friends
, therefore please think as to whether
it would be appropriate for submitting a
representation against draft RRs for increase of promotee quota to 90%, promotion
to STS, allowing weightatge, post based roaster, and to maintain parity starting from sub-feeder
grades ( base cadre parity or parity from the grade of Inspector) etc ? A
question may arise as to how to solve such burning issues? To solve these issues a recommending proposal
is required to be prepared by CBEC to submit it to next forum .First initiation
is required to be made by CBEC. How CBEC will start such initiation? In this
connection a systematic representation is to be submitted by all Associations.
Representations through MPs are also required to be submitted and thereafter
all Associations should meet Ministers /
Board officials to put pressure on CBEC to call for a Board meeting and to take
a final decision on such issues. Then only progress can be made on such burning
issues. Submission of mere representation on such issues against draft RRs may not yield any result.
Think
over the suggestions please.
Considering
such issues our next Central Executive Committee Meeting is very crucial to
take a decision on such burning issues.
The next Central Executive Committee meeting of our Association will be
held at Jammu on 12.04.15. Shri A.K. Sharma , President of our Association is
organizing such meeting. All the Executive Committee Members are requested to
attend such meeting without fail. The agenda points of such meeting will be
intimated after finalization of the same in advance. Those will attend the
meeting are requested to contact Shri A. K. Sharma , President directly for accommodation etc..
LOKANATH
MISHRA
SG/
IRSPOA.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.